Heat supply networks and structures on them
Reconstruction of the heating main from UT-13(TM3) to st. Moskovskaya 31/1, 27/1
Working draft
Description
The total length of the heating network is 1308.7 m
2Ø219x6 - 156.4 m
2Ø159x4.5 - 152.4 m
2Ø133x4 - 72.1 m
2Ø108x4 - 79.5 m
2Ø89x4 - 116.1 m
Branches
2Ø108x4 - 256.0 m
2Ø89x4 - 73.2 m
2Ø76x3 - 390.5 m
2Ø57x3 - 12.5 m
Client
Joint Stock Company "Astana-Teplotransit"
Details
Year:
2023
Region
Astana