Projects implemented over the last 10 years

Projects implemented over the last 10 years

  • The following facilities are designed and placed into commission under the projects developed by the Institute after 2000:

2009

  • 55MW steam condensing turbine at SDPP of Kazakhmys Corporation LLP
  • Heating boiler plant in the KAMAZ microdistrict of Almaty

2008

  • 420t/h power-generating steam boiler at CHPP-2 of Astana
  • 12MW steam cogeneration turbine at Station No.2 of CHPP in Ridder;
  • Continuation of construction of facilities for the Kashagan East field development experimental programme with respect to the following energy sources:
  • Offshore complex: gas-turbine power plant;
  • Onshore complex: gas-turbine and steam power plant, high pressure steam boiler plant.

2006

  • 120MW steam cogeneration turbine at CHPP-2 of Astana
  • 27MW gas turbine at Uralsk CHPP

2005

  • High pressure steam generating station SGS-3 at the Karazhanbas oil field

2004

  • 12MW steam cogeneration turbine at Station No.1 of CHPP in Ridder

2003

  • Electric power substation and power transmission lines for the external electrical supply of oil-refining station of the "Karachaganak — Bolshoi Chagan – Atyrau" oil export pipeline

2002

  • 120MW gas-turbine power plant of the Karachaganak Gas Treatment Plant
  • 37MW steam turbine at Zhezkazgan CHPP of Kazakhmys Corporation LLP
  • 37MW steam turbine at Balkhash CHPP of Kazakhmys Corporation LLP

2001

  • Electrical networks and 110kV substation at the Karachaganak oil field;